The tool enables dynamic updates to evaluations as the design progresses. This is called “Dynamic Evaluations” in the tool. The evaluations are updated on the fly and the impacts are computed dynamically. System connections specify at a granular level how the systems interact with one another. In this article, we assume that there are two systems in the project and show how connections can be set for one system; in a real project, you will have to setup connections for all the systems.
-
On the Project Administration page, click on the “Evaluation Update Model” option.
-
Choose a system for which connections have to be set and a five-level impact from -2 to + 2. The evaluation will be updated in this scheme as well.
-
Once the connections are set, click on the “Set Connections” button to set the connection for this system.